Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Div
stylewidth:100%
idkt-documentation-section
aligncenter
HTML Table
cellpadding10px
Table Row (tr)
Table Cell (td)
width70%
valigntop

Project managers must constantly juggle with time, scope and budget; the well-known constraint triangle. FOLIO helps you deal with that by letting you define a financial plan, a scope and a time frame through Folios.

Anchor
Create
Create
Creating a Folio

Anchor
CreateFromGettingStarted
CreateFromGettingStarted
Creating a Folio from the Getting Started page

You access the Getting Started page from FOLIO's main menu (Portfolio > Getting started). From the Getting started page you will be able to create a folio Folio by clicking the Create a new folio link. This page gives you access to the user documentation, the latest release notes and many other useful links and information.

 

Anchor
CreateFromManagePortfolios
CreateFromManagePortfolios
Creating a Folio from the Manage Portfolios page

You access the Manage Portfolios page from FOLIO's main menu (Portfolio > Manage Portfolios). When in the Manage Portfolios page, you can create a Folio by clicking the Create New Folio button.

 

Anchor
CreateFromFolio
CreateFromFolio
Creating a Folio from inside another Folio

You can create a folio Folio by clicking the Create item in the Folio action menu when you are currently viewing a Folio. The Folio action menu is available in all pages of a Folio.

 


Anchor
Options
Options
Folio creation options

Once you are presented with the Folio creation dialog, you can proceed with Folio creation in various ways.

These options mainly determine how the Folio's scope will be defined.

Info
titleFolio scope

The Folio scope is a list of JIRA issues, defined by a JIRA saved filter. When a Folio is created, FOLIO automatically creates a saved filter owned by the user creating the Folio. The filter can be seen in the folio's configuration, under the Scope tab. The filter is private by default but can easily be shared by editing the shares of the saved filter. Unless the folio is associated with an Agile board, the query of the saved filter can be modified at any time.

Anchor
Projects
Projects
JIRA Projects

Use this option when the scope of the folio should include all issues belonging to one or more existing JIRA projects. Selecting this option brings up a dialog where you can pick JIRA projects to include. To add a project, start typing its name in the Projects field and select the project in the suggestion list. Repeat for every project to add.

Required Parameters
Folio Name 

Name of the folio.
Maximum of 255 characters

Start Date

Date from which expenses and revenues defined in the folio will be accounted for. This would normally be the date at which the team is planned to start working on the scope of the folio.
Must be before the end date

End Date

Date until which expenses and revenues defined in the folio will be accounted for. This is the planned end date of the project and is critical since it defines the pace of progress the team should maintain to successfully complete the folio's scope.
Must be after the start date

Revenue Support

If selected, enables revenue tracking. This adds a Revenue tab for registering planned and actual revenues in the Folio and revenue information in overviews and reports.

ProjectsList of JIRA projects that will constitute the scope of the folio.
Optional Parameters
DescriptionDetailed description of the folio

 

Anchor
Advanced
Advanced
Advanced

Use this option when the scope of the Folio should be based on an existing Saved filter. This gives you total flexibility on how the list of issues for the Folio is defined.

Required Parameters
Folio Name 

Name of the folio.
Maximum of 255 characters

Saved FilterExisting JIRA saved filter that will define the scope of the folio
Start Date

Date from which expenses and revenues defined in the folio will be accounted for. This would normally be the date at which the team is planned to start working on the scope of the folio.
Must be before the end date

End Date

Date until which expenses and revenues defined in the folio will be accounted for. This is the planned end date of the project and is critical since it defines the pace of progress the team should maintain to successfully complete the folio's scope.
Must be after the start date

Revenue Support

If selected, enables revenue tracking. This adds a Revenue tab for registering planned and actual revenues in the Folio and revenue information in overviews and reports.

Optional Parameters
DescriptionDetailed description of the folio


Anchor
Scrum
Scrum
Scrum

Info

This option is only available if you have GreenHopper 6.1.1 or higher installed and fully lincensed.

Use this option when you want to track a project based on an Agile Scrum Board. The scope will be defined by the filter of the Scrum board and most of the Folio's configuration settings such as the working days and the earning rules will be driven by the Board's configuration settings, avoiding duplication.

 

Required Parameters
Folio Name 

Name of the folio.
Maximum of 255 characters

Scrum Board

Scrum board to associate your folio with
Note that only the Scrum boards you can see will be available as options

Start Date

Date from which expenses and revenues defined in the folio Folio will be accounted for. This would normally be the date at which the team is planned to start working on the scope of the folioFolio.
Must be before the end date

End Date

Date until which expenses and revenues defined in the folio Folio will be accounted for. This is the planned end date of the project and is critical since it defines the pace of progress the team should maintain to successfully complete the folioFolio's scope.
Must be after the start date

Revenue Support

If selected, enables revenue tracking. This adds a Revenue tab for registering planned and actual revenues in the Folio and revenue information in overviews and reports.

Optional Parameters
DescriptionDetailed description of the folioFolio
Note

The saved filter associated with a Folio created from a Scrum Board will be kept synchronized with the Board's saved filter query. Any changes made on the query of the Folio's filter will be ignored.

Anchor
Kanban
Kanban
Kanban

Info

This option is only available if you have GreenHopper 6.1.1 or higher installed and fully lincensed.

Use this option when you want to track a project based on a Kanban Board. The Folio's scope will be defined by the filter of the Kanban board and most of the Folio's configuration settings such as the working days and the earning rules will be driven by the Board's configuration, avoiding duplication.

Required Parameters
Folio Name 

Name of the folioFolio.
Maximum of 255 characters

Kanban Board

Kanban board to associate your folio Folio with
Note that only the Kanban Boards you can see will be available as options

Start Date

Date from which expenses and revenues defined in the folio Folio will be accounted for. This would normally be the date at which the team is planned to start working on the scope of the folioFolio.
Must be before the end date

End Date

Date until which expenses and revenues defined in the folio Folio will be accounted for. This is the planned end date of the project and is critical since it defines the pace of progress the team should maintain to successfully complete the folioFolio's scope.
Must be after the start date

Revenue Support

If selected, enables revenue tracking. This adds a Revenue tab for registering planned and actual revenues in the Folio and revenue information in overviews and reports.

Optional Parameters
DescriptionDetailed description of the folioFolio
Note

The saved filter associated with a Folio created from a Kanban Board will be kept synchronized with the Board's saved filter query. Any changes made on the query of the Folio's filter will be ignored.

Anchor
Sample
Sample
Sample Folio

Select this option for example if you are evaluating or want to demonstrate Folio with mock data. This allows you to safely explore FOLIO's features by creating a JIRA project and an associated Folio as it would be while in progress. Please refer to the Sample project page for more information.

 

Table Cell (td)
width30%
valigntop
Panel

On this page:

Panel

Related pages:

Style
#breadcrumb-section {margin-bottom: 10px;}
#breadcrumbs li,#breadcrumbs li a{color: #999;}
#main-header {margin: 10px 0 0;}
#title-text a {color: #3B73AF !important;}
.page-metadata {transition: opacity .25s ease-in-out;-moz-transition: opacity .25s ease-in-out;-webkit-transition : opacity .25s ease-in-out;}
.page-metadata {opacity: 0; margin: 0 0 30px;}
.page-metadata:hover {opacity: 1.0;}
#title-text {font-family: "kulturista-web",sans-serif;font-weight: 300;font-size: 50px;line-height: 75px;padding-bottom: 5px}
#splitter-sidebar img{top: 17px;position: relative;}
#splitter-sidebar h1 { font-size: 1.2em; margin: 0; padding-bottom: 20px; padding-top: 0;}