Team Workload Report
The Team Workload report presents the team workload by period and by titles based on the issues due dates. To access this report, click on the Report tab (or hit '6') and then click on the 'View report' button next to the Team workload report preview. This will bring up the report with the today's date as the default start (From) and end (To) date. The report will be automatically refreshed when one of its parameters changes. This report is available for folios and portfolios If an issue does not have a due date, FOLIO will take the end date of the folio as a fallback. The report first presents a bar chart showing a bar of assigned hours for each role or member grouped by period: color are automatically assigned based on the number of roles or members. Hovering the bars will open a tooltip showing the precise assigned hours. The dates labels on x-axis can be clicked to navigate to the detailed workload information for the period ending on that date.
Team Workload Chart
Detailed period sectionDetailed information for all periods follow the chart. Each of these sections shows the list of roles, ordered alphabetically and grouped by team roles and then by team member.
Since the issue scheduling of this report is based on the due dates, the remaining estimates issues may overlap multiple periods.
Issues panel
|
Grouping By |
|
---|---|
From | Start of the time frame for that report. The start date can be any date from today's date to any date in the future. Start date If the report start date is before today, the report start date will use today's date as start date. |
To | End of the time frame for that report. Notes:
|
Frequency | This allows you to break down the team workload by week, 2 weeks, 4 weeks, or Monthly periods or to not break it down (Total) Note that report start date "day" will be the periods starting day. This means if your report start date is a Tuesday and the frequency is Weekly the report will display weekly expenses from Tuesday to next Monday. Monthly frequency breaks down the report data by calendar month. Total means no break down will occur: all issues for the selected period will be included in a single section. |
Roles | Position titles to be included in the report |
Members | Team members to be included in the report |
Labels | This allows you to display amounts for the selected Jira Issue Label. (not available at the portfolio level) Note : see Using Labels for more info on. |
Printing the report
Selecting Printable in the report's action menu found at the top right of the report's parameters panel provides a printer-friendly version of the report.
Printable version of the report
Exporting to Excel
The Team Workload report can be exported to Excel format to give you all the latitude you need to further digest, analyze or graph the data. Do it by selecting Export to Excel item in the report's action menu found at the top right of the report's parameters panel. The parameters that were used to generate the report can be found on the second tab of the generated spreadsheet.
Excel export of the report